| ID | Title | Case | Customer | Job | Total | Status |
|---|---|---|---|---|---|---|
| 14 | T8 | 10 | 9 | $2400.00 | draft | |
| 13 | T8 | 9 | 6 | $10300.00 | draft | |
| 12 | T7 | 10 | 10 | $10300.00 | draft | |
| 11 | T6 | 10 | 8 | 18 | $10300.00 | draft |
| 10 | T5 | 10 | 8 | $10300.00 | draft | |
| 9 | T4 | 10 | 9 | $10300.00 | draft | |
| 8 | T3 | 10 | 9 | $10300.00 | draft | |
| 7 | Ttt | 10 | 9 | $10300.00 | draft | |
| 6 | Temp Power and Full Utility Service | 4 | $10300.00 | draft | ||
| 5 | Replace Bad PV Panels | 4 | 11 | $0.00 | draft | |
| 4 | Rrr | $0.00 | draft | |||
| 3 | Test | 2 | 3 | $0.00 | draft | |
| 2 | Rich Lakeside Trikalski Estimate | $0.00 | draft | |||
| 1 | Test | 4 | $0.00 | draft |